Public Works

Public Works Blog

It's always wise to stay off the (wet) lines

Posted On: June 18, 2019

Will the chip sealing crew be in your area this summer?

The importance of a yellow stripe down the middle of a roadway or the white line along its shoulder is lost on many of us. It’s one of those things that’s easy to overlook until you need it. In this case, that may be during the dark of night or a sudden rainstorm.

Roadway striping plays a valuable role in efforts to keep travelers safe on the roadway. The Traffic Safety crew of Chelan County Public Works re-stripes more than 800 miles of county roads and intersections annually.

With those kind of miles, the striping efforts require between 10,000 and 12,000 gallons of paint a year and another 21 tons of the tiny reflective glass beads that are added to the yellow and white road paint.

With striping underway on Chelan County’s roads, we answer the following common questions that pop up each year:

Why do you re-stripe all the roads every year?

Lane striping paint has a short lifetime. The long-line stripes wear out from car and truck tires, chains and studded tires, and snowplows. Rain, snow, sun, sanding material and anti-icing chemicals also take their toll on the paint.

“We do our best each spring to make the lines bright and reflective again, especially after a winter of plowing,” said Ryan Rush, foreman of the Traffic Safety crew.

What is the road striping season?

Striping is highly weather dependent. You can’t stripe in the rain, and the roadway must be dry. Temperatures also need to be at least 50 degrees.

Hand striping, or the painting of stop bars and crosswalks, typically begins in April and ends in May or early June. The high-tech striper truck hits the streets to paint the long lines (no passing or passing lines, center lines, fog lines and shoulder lines) by early to mid-June. Its work isn’t done until after road preservation season in September.

Just what makes the paint reflective?

Reflective paint is essential for nighttime driving and driving under foggy or rainy conditions. When hit by a vehicle’s headlights, the glass beads reflect the light, making the road – and all its twists and turns – brighter. About 7 pounds of beads go into every gallon of paint. In addition, the specialized striper truck used in the work is precise. Relying on its computerized technology, the striper can adjust the lane and line width on the fly. It carries about 500 gallons of paint and stripes at a rate of 8 to 10 miles per hour.

How long does it take for the paint to dry?

Roadway paint is designed to dry very quickly – 30 seconds to 1 ½ minutes. That being said, motorists are advised not to pass a striper at work. (The striper’s signage warns motorists not to pass.) If cars are behind the striper, oftentimes the crew will pull over; however, it takes a little time to stop striping and pull to the side of the road.

And, please, do not drive over the wet lines. Doing so not only smears and ruins the lines but it also may mean you’ll have road paint on your vehicle. If you do get paint on your vehicle, you will need to wash it with a pressure washer as soon as possible. WD40 also may help in removing it.

Ryan asks that motorists who come upon the crew working this summer be patient. Striping is a necessary and important part of helping to keep travelers safe on roadways.

“Please be patient,” Rush said. “And don’t drive on the wet paint.”


Older Articles

Will the chip sealing crew be in your area this summer?

Posted On: June 15, 2020

Will the chip sealing crew be in your area this summer?

This year, the county road crew starts chip sealing the week of June 22. Do you know if they'll be on your street?...

Read More arrow_forward

Road crews hit the road with COVID precautions in place

Posted On: June 04, 2020

Road crews hit the road with COVID precautions in place

Chelan County road crews are back on the road in full force after more than two months of working with reduced crew sizes during the governor’s Stay H...

Read More arrow_forward

Headed to the MRWF? Secure that load for safe travels!

Posted On: December 11, 2019

Headed to the MRWF? Secure that load for safe travels!

The new Chelan County Moderate Risk Waste Facility is open to the public. The facility is at 3612 Highway 97A in Wenatchee....

Read More arrow_forward

Code of the West: A reminder that life is different in the country

Posted On: September 06, 2019

Code of the West: A reminder that life is different in the country

The Code of the West was adopted in 2002 by Chelan County commissioners. It is not a formal code, but rather a philosophy or friendly advice for peopl...

Read More arrow_forward

In an emergency, don't let your address delay help from reaching you

Posted On: January 15, 2019

In an emergency, don't let your address delay help from reaching you

Have you ever asked yourself the question: When seconds count, how easily will emergency responders be able to find my home? Learn how your address ma...

Read More arrow_forward

Winter is coming -- it's time to remove any vehicles parked along the roadside

Posted On: November 08, 2018

Winter is coming -- it's time to remove any vehicles parked along the roadside

With Chelan County Public Works now preparing for winter and the inevitable snowfall that will come with it, our road crews are asking residents to re...

Read More arrow_forward

Preserving a piece of Cashmere's history

Posted On: October 22, 2018


Preserving a piece of Cashmere's history

Those people interested in giving the West Cashmere Bridge a new home -- and preserving its history -- have until Jan. 1, 2019, to contact Chelan Coun...

Read More arrow_forward

Need wood chips? Pick them up at the Chelan Transfer Station

Posted On: September 07, 2018

Need wood chips? Pick them up at the Chelan Transfer Station

Free shredded wood chips are available at the Chelan Transfer Station until about early October....

Read More arrow_forward

County to build year-round moderate risk waste facility

Posted On: September 07, 2018

County to build year-round moderate risk waste facility

Chelan County is in the process of opening a facility – called a moderate risk waste facility – that will be open year round to residents in need of s...

Read More arrow_forward

2018 road preservation project revs up

Posted On: May 03, 2018


2018 road preservation project revs up

The 2018 Road Preservation Program is underway throughout Chelan County. Read about the list of roadways in the preservation program this year....

Read More arrow_forward

Chelan County Calendar

Upcoming events and schedules at the county!

  • 22
    May 2024
    06:30 PM - 08:00 PM

    Planning Commission - May 22, 2024

    Posted by: Community Development

    400 Douglas Street
  • 15
    May 2024
    07:00 PM - 08:00 PM

    Assessor's Office Community Meeting: Leavenworth and Lake Wenatchee

    Posted by: Chelan County Assessor

    Chelan County Assessor Wes Cornelius invites property owners and all interested parties to attend one of four community meetings scheduled this spring throughout the county.

    Chelan County Fire District 3 station
  • 13
    May 2024
    08:00 AM - 05:00 PM

    Final day to withdraw from the ballot

    Posted by: Chelan County Elections

    Final day to withdraw from the ballot

  • 10
    May 2024
    05:00 PM - 05:30 PM

    Lot Drawing for Candidates

    Posted by: Chelan County Elections

    Lot drawing for candidates placement on the ballot.

    Chelan County Elections Office
  • 08
    May 2024
    10:00 AM - 12:00 PM

    Chelan County Civil Service Commission

    Posted by: Human Resources

    The Chelan County Civil Service Commission will be meeting on May 8, 2024.

    Chelan County Commissioners Office, ES Conference Room.