Back

County to build second tipping floor at Dryden Transfer Station

Chelan County commissioners have called for bids on the construction of a second tipping floor at the Dryden Transfer Station. Bids are due on Feb. 25 and will be opened at the commissioners regular board meeting.

The second tipping floor is being constructed because of a plan to divide commercial loads from private loads that come into the transfer station, which has seen steady annual growth in the volumes of garbage received at the county-owned facility for at least the past seven years. In 2019, commercial and private citizens brought 23,140 tons of garbage to the transfer station. That's a 46 percent increase from five years ago, when the transfer station recorded 15,771 tons of garbage.

The new floor will be built to the east of the current tipping floor. The project incluces resufacing the existing trash pit at the main tipping floor. The engineers estimate on the construction project is between $650,000 and $750,000. Construction is expected to start this spring and take six months.

The call for bids can be found on the Chelan County Public Works bidding page.

Last Updated: 08/24/2021 09:04 AM

Chelan County Calendar

Upcoming events and schedules at the county!

  • 14
    Jan 2026
    10:00 AM - 12:00 PM

    Chelan County Civil Service Commission

    Posted by: Human Resources

    The Chelan County Civil Service Commission will be meeting on January 14, 2026.

    Chelan County Commissioners Office, CM Conference Room 1
  • 09
    Jan 2026
    08:00 AM - 05:00 PM

    Ballots mailed for military, overseas and out of state voters

    Posted by: Chelan County Elections

    Ballots mailed for Military, Overseas and Out of State voters

  • 03
    Jan 2026
    09:00 AM - 04:00 PM

    Monthly Drop-Off Saturday - Jan. 3, 2026

    Posted by: Solid Waste Management

    Drop-Off Saturday at the Moderate Risk Waste Facility is Jan. 3

    Chelan County Moderate Risk Waste Facility
Application: 7AEA67B9B0D58CFA59F53E525A3AA3D5 [View Routes,Run Tests, View Tests]
Framework: CFWheels 2.0.1 [View Docs]
Environment: Development
Host Name: websrv
CFML Engine: Adobe ColdFusion 2021,0,04,330004
Data Source: Cccmsdbv2 [Migrations]
Database Adapter: SQLServer
URL Rewriting: ON
URL Obfuscation: Off
Plugins: None
Route: Wildcard
Controller: News
Action: Article
Key(s): county-to-build-second-tipping-floor-at-dryden-transfer-station
Parameters: None
Execution Time: 62ms (action ~46ms, view ~46ms)