Community Development

Renewals and New Applicants

New Application Timeline

The application window for NEW Tier 2 and Tier 3 applications for 2025 opens June 1 - July 31, 2024. Permits issued during this application cycle are for the 2025 operation year. These applications are reviewed in the order received -- up to the allowed number of permits in each area. Check STR statistics here. The only applications accepted outside the standard application window are for Tier 1 owner-occupied rentals. Applications are not accepted after 4 p.m. at the office counter.

 

New STR Application Process

Application Window: June 1-July 31

Brochures: English     Spanish

Applications for new Tier 2 and Tier 3 short-term rentals are accepted annually June 1 - July 31 for areas that have capacity within the cap limits. They will be processed on a first-come, first-served basis. Applications presented at the counter will not take precedence over those sent in electronically or via USPS. During the application window, applications will be date/time stamped in order of receipt so they may then be processed in that order. This applies to all methods of submission.

There is a limit to the number of Tier 2 and Tier 3 STRs allowed in Chelan County. Refer to Chelan County Code 11.88.290 for specific information.

A checklist of necessary items for submission is available to help you through the application process. To hand in a complete application, you will need to:

  1. Complete a Short Term Rental Application
  2. Submit a Property Management Plan with all additional required documentation with your application. See additional fire resources further down this page.
  3. Good Neighbor Guidelines: English     Spanish
  4. Check your onsite Sewage/Septic. If you are on septic, submit a copy with your application. If you are on sewer, submit a copy of the most recent bill for the STR address with your application.
  5. Purchase Liability Insurance and submit a copy of at least the declarations page showing the liability coverage limit with your application showing you have a minimum of $1 million in liability insurance for the rental.
  6. Complete any additional necessary land use permits (Do you also need a Conditional Use Permit for your project?)
  7. STR Pre-Inspection Checklist  (complete all pages; using Chrome browser works best).

 

Submission

Do not submit your application prior to the application window start date for Tier 2 or Tier 3; we will not look at new STR applications before the opening date and we will return any received before the window opens. If you do choose to submit electronically, email the application to CD.STR.applications@co.chelan.wa.us  This email address is for submissions only; do not send questions or they may go unanswered.

Have more question? Please check out the Frequently Asked Questions section here.  If this doesn't answer your questions, please reach out to staff.

 

Application Tips

  • If submitting electronically, each document being submitted needs to be saved separately in PDF format and named appropriately (Application, Property Management Plan, Septic Permit, etc.). Please attach all documents for your submittal individually to application. We do not accept links to Google Docs or zip files. Neither electronic signatures nor photos of documents are accepted.
  • If you prefer, you can also submit your application in person or by mail to: Community Development: STR Department, 316 Washington St., suite 301, Wenatchee, 98801. When received, the applicationt will be added to those already submitted and will be reviewed in the order received. While we do nott require the use of a tracked-mailing service, it may offer you assurance that your application was delivered.
  • Once complete application materials are submitted and fees paid, the Community Development STR staff will review. If all is approved, a short-term rental permit will be issued.  When you receive your final permit, a copy of the signed permit must be returned to the department for your file.
  • Please note that due to the volume of permits handled, staff will not respond to requests for where your permit is in line or when your permit process will be complete. We will do our best to achnowledge receipt of application emails.
  • An STR owner or operator must include the Chelan County STR permit number in all advertisements and must ensure it is displayed prominently on platforms and other forums for rental (AirBnB, VRBO, Craigslist, a poster, etc.) and on marketing materials, such as brochures and websites.

 

Renewal STR Permit Process

Renewal Application Window: Sept. 1 - Oct. 31

Renewals may be submitted in person, electronically or via mail. If mailing, we recommend sending your application via a method that provides tracking. The timeline listed above is for owners/property managers to submit their renewal materials. STR staff then have until Dec. 31 to process all renewals and get them back to owners before the next permit year begins.

 

Submission

For the STR permit renewal process, you will need: 

1. Short Term Rental Renewal Application: filled out and marked for "renewal"

2. STR Self-Certification Checklist: for the fire safety requirement (best if use Chrome browser)

3. Photographic Proof of Sign or, if you have been granted a sign variance, proof of your annual mailings (copies of the registered mailing receipts with addresses of where sent and a copy of the letter).

4. When you receive your final permit, a copy of the signed permit must be returned to the department for your file.

5. The only other forms required to be submitted with renewals are circumstantial (see below)

 

Did any of your information change during the year?  

  • Did you change your property management company or qualified person?
  • Did your septic get upgraded?
  • Did your contact information change?

If so, then you will need to submit an updated Property Management Plan, Good Neighbor Guidelines and copies of new septic information and you may need to update your sign. Please make sure your mailing address is correct with the Chelan County Assessor's Office as well. 


STR Permit Transfer

Are you the new owner of a permitted STR? 

If you are a new owner of a property that currently has a short-term rental permit, the permit may or may not be transferable, depending on your specific situation. Contact department staff to find out. If the permit is transferable, it must be transferred to the new owner's name within 30 days of closing and you will need to submit the following forms along with a request to transfer the permit:

  • Application
  • Property Management Plan
  • Good Neighbor Guidelines
  • Proof of $1 million in liability insurance for the rental property
  • May require new sign if the qualified person/phone number changes and you will need to send in a photo of the new, posted sign

 

Submission

Please do not submit your renewal application prior to the application window start date for Tier 2 or Tier 3 (Sept. 1-Oct. 31). We will not look at new STR applications before the opening date and we will return any received before the window opens. If you do choose to submit electronically, you can send them via email at CD.STR.applications@co.chelan.wa.us  This email address is primarily for submissions; questions submitted here may have a delay in response. 

 

Application Tips

  • If submitting electronically, each document being submitted needs to be saved separately in PDF format and named appropriately (Application, Property Management Plan, Septic Permit, etc.). Attach all documents for your submittal individually to application. We do not accept links to Google Docs or zip files or electronic signatures or photos of documents.
  • If you would prefer, you can also submit your application in person or by mail to: Community Development: STR Department, 316 Washington St., suite 301, Wenatchee, 98801. When received, it will be added to those already submitted and will be reviewed in the order received. While we do not require the use of a tracked mailing service, they do offer you assurance your application was delivered.
  • An STR owner or operator must include the Chelan County STR permit number in all advertisements and must ensure it is displayed prominently on platforms and other forums for rental (AirBnB, VRBO, Craigslist, a poster, etc.) and on marketing materials, such as brochures and websites.

 

Posted: 09/17/2021 08:47 AM
Last Updated: 04/17/2024 01:38 PM

Community Development Calendar

Upcoming events and schedules at the county!

  • 22
    May 2024
    06:30 PM - 08:00 PM

    Planning Commission - May 22, 2024

    Posted by: Community Development

    400 Douglas Street
  • 26
    Jun 2024
    06:30 PM - 09:00 PM

    Planning Commission - June 26,2024

    Posted by: Community Development

    400 Douglas Street
  • 24
    Jul 2024
    06:30 PM - 09:00 PM

    Planning Commission - July 24, 2024

    Posted by: Community Development

    400 Douglas Street
  • 28
    Aug 2024
    06:30 PM - 09:00 PM

    Planning Commission - August 28, 2024

    Posted by: Community Development

    400 Douglas Street
  • 25
    Sep 2024
    06:30 PM - 09:00 PM

    Planning Commission - September 25, 2024

    Posted by: Community Development

    400 Douglas Street